The project at Winneke Treatment Plant involves building a new reception and security access point, replacing the current entry and improving parking for easier access for the public and employees.
The restoration of the Rates office and Caretaker's house preserved their original design while adding modern upgrades. The space now serves as a meeting room with additional office space for employees.
The project involved designing a walkway that allowed the community to enjoy natural surroundings while ensuring accessibility for all. It minimised disruption to local flora and fauna, enhancing the existing wildlife habitat while improving functionality.
The project addressed a safety issue for operators accessing the Spillway Wall for maintenance. The challenging terrain posed risks of slips and falls, prompting the design of a safer, aesthetic alternative that blended with the natural landscape.
Battery backup rooms were enhanced in power stations to meet fire protection standards. The existing rooms lacked adequate fire prevention materials, and the client's generic designs required constant revisions to match current conditions.